DfMA-Based Bolted Modular Detailing

Section 1: Service Overview
Where Engineering Becomes Executable

Design drawings prove that the structure works.Detailing drawings make the structure ready for fabrication, transport and assembly.We use Tekla-based detailing, bolted connection logic and DfMA thinking to reduce fabrication errors and site rework risks.



Section 2: CORE TECHNICAL CAPABILITIES
 

Detailing Based on DfMAand Buildability Logic

Section 3: DELIVERABLES & MATERIALS

Detailing Materials
You Will Receive
●Tekla 3D Model  ●General Arrangement Drawings  ●Shop Drawings  ●Assembly Drawings ●Single Part Drawings  ●Bolt List   ●Material List / BOM  ●Buildability Review Notes  


Section 4: Simplified Applicable Standards

Domestic: SJG 129-2023, GB 50205, JGJ 82, GB/T 36320, GB/T 51447, GB/T 40485
International: EN 1993-1-8, AISC 360 (Chapter J), EN 1090-2, BS 5950, ISO 4032, ISO 898
DfMA Guideline: RIBA DfMA Guide, MOHURD Intelligent Construction & DfMA Specifications

Section 5: Why Choose ARTISANSTRUCTURE

Engineering Judgment Beyond Software Results
We combine advanced analysis tools with engineering experienceand code knowledge to deliver safe, efficient and buildablestructural solutions






اتصل بنا

إذا كانت لديكم أي استفسارات، تواصلوا معنا اليوم! لا تترددوا. نسعى جاهدين لتقديم أفضل خدمة لعملائنا.
اسم
بريد إلكتروني
دولة
Project stage
Project stage
Service Requirements
رسالة
Project-related materials
Upload documents